2026-03-24 13:42:37 +00:00

45 lines
1.1 KiB
Markdown

# PBS Decisions
This directory contains PBS decision records.
## Purpose
A decision record is the bridge between agenda discussion and normative spec text.
Use this directory to capture:
- what was decided,
- why that direction was chosen,
- which constraints now apply,
- what remains intentionally out of scope,
- which specs must be updated.
Architecture and decisions must be resolved before implementation.
## Expected Format
A decision record should usually include:
1. Title
2. Status
3. Date or Cycle
4. Context
5. Decision
6. Invariants
7. Explicit Non-Decisions
8. Spec Impact
9. Validation Notes or Examples
## Writing Rules
- Write in stable, reviewable language.
- State the adopted decision first and clearly.
- Capture architectural constraints and invariants explicitly.
- Record what is still not decided so later implementation does not guess.
- Point to the exact specs that need integration.
## Implementation Rule
If implementation work exposes a missing decision, do not infer it.
Stop, surface the ambiguity, and return it to agenda or decision review.