73 lines
3.9 KiB
Markdown
73 lines
3.9 KiB
Markdown
# Studio Pull Requests
|
|
|
|
This directory contains executable plans for Studio work.
|
|
|
|
## Purpose
|
|
|
|
A Studio pull-request or plan artifact packages a decision into an implementable sequence.
|
|
|
|
Use it to:
|
|
|
|
- separate shell work from workspace work,
|
|
- describe service and event-lane integration steps,
|
|
- define acceptance criteria for UI behavior,
|
|
- make validation and regression risks explicit before code changes.
|
|
|
|
## Expected Format
|
|
|
|
A Studio plan should usually include:
|
|
|
|
1. Briefing
|
|
2. Objective
|
|
3. Dependencies
|
|
4. Scope
|
|
5. Non-Goals
|
|
6. Execution Method
|
|
7. Acceptance Criteria
|
|
8. Validation
|
|
9. Affected Artifacts
|
|
|
|
## Writing Rules
|
|
|
|
- Organize by execution sequence, not by brainstorming.
|
|
- Keep visual design, interaction behavior, and service integration clearly separated.
|
|
- State what the user should be able to do after the change lands.
|
|
- Tie the plan back to Studio specs and decisions explicitly.
|
|
|
|
## Current Queue
|
|
|
|
The current Studio execution queue is:
|
|
|
|
1. [`PR-05a-assets-workspace-foundation-and-service-state.md`](./PR-05a-assets-workspace-foundation-and-service-state.md)
|
|
2. [`PR-05b-asset-navigator-search-filters-and-selection.md`](./PR-05b-asset-navigator-search-filters-and-selection.md)
|
|
3. [`PR-05c-selected-asset-details-contract-and-preview.md`](./PR-05c-selected-asset-details-contract-and-preview.md)
|
|
4. [`PR-05d-assets-activity-progress-and-logs-integration.md`](./PR-05d-assets-activity-progress-and-logs-integration.md)
|
|
5. [`PR-05e-assets-staged-mutations-preview-and-apply.md`](./PR-05e-assets-staged-mutations-preview-and-apply.md)
|
|
6. [`PR-07a-assets-event-topology-and-lifecycle-foundation.md`](./PR-07a-assets-event-topology-and-lifecycle-foundation.md)
|
|
7. [`PR-07b-asset-navigator-and-row-subscriptions.md`](./PR-07b-asset-navigator-and-row-subscriptions.md)
|
|
8. [`PR-07c-asset-details-and-form-lifecycle.md`](./PR-07c-asset-details-and-form-lifecycle.md)
|
|
9. [`PR-07d-asset-mutation-and-structural-sync-orchestration.md`](./PR-07d-asset-mutation-and-structural-sync-orchestration.md)
|
|
10. [`PR-07e-assets-refactor-cleanup-and-regression-coverage.md`](./PR-07e-assets-refactor-cleanup-and-regression-coverage.md)
|
|
11. [`PR-08-assets-workspace-panel-package-boundaries-and-local-subscriptions.md`](./PR-08-assets-workspace-panel-package-boundaries-and-local-subscriptions.md)
|
|
12. [`PR-06-project-scoped-studio-state-and-activity-persistence.md`](./PR-06-project-scoped-studio-state-and-activity-persistence.md)
|
|
|
|
The `PR-07` family is a corrective refactor pass for the current `Assets` implementation.
|
|
It exists to replace the refresh-heavy direction with lifecycle-managed, event-driven ownership.
|
|
It also establishes the intended Studio-wide workspace framework, with `Assets` as the first consumer and proof point.
|
|
|
|
`PR-08` is the package-topology and subscription-ownership follow-up for that same direction.
|
|
It enforces list/details package boundaries and requires every panel to consume the workspace bus directly.
|
|
|
|
Recommended execution order:
|
|
|
|
`PR-05a -> PR-05b -> PR-05c -> PR-05d -> PR-05e -> PR-07a -> PR-07b -> PR-07c -> PR-07d -> PR-07e -> PR-08 -> PR-06`
|
|
|
|
Next planned family for `Bank Composition`:
|
|
|
|
13. [`PR-10a-bank-composition-details-dto-projection.md`](./PR-10a-bank-composition-details-dto-projection.md)
|
|
14. [`PR-10b-bank-composition-base-components.md`](./PR-10b-bank-composition-base-components.md)
|
|
15. [`PR-10c-bank-composition-section-shell-and-form-session-integration.md`](./PR-10c-bank-composition-section-shell-and-form-session-integration.md)
|
|
16. [`PR-10d-bank-composition-family-policies-and-section-coordinator.md`](./PR-10d-bank-composition-family-policies-and-section-coordinator.md)
|
|
17. [`PR-10e-bank-composition-workspacebus-events-and-local-orchestration.md`](./PR-10e-bank-composition-workspacebus-events-and-local-orchestration.md)
|
|
18. [`PR-10f-bank-composition-apply-through-packer-and-snapshot-refresh.md`](./PR-10f-bank-composition-apply-through-packer-and-snapshot-refresh.md)
|