id: LSN-0068
|
|
ticket: vm-resource-limits-handle-safety-and-long-run-stability
|
|
title: Resource Stability Needs Phase-Aware Evidence
|
|
created: 2026-10-14
|
|
tags: [vm, memory, gc, testing, ownership]
|
|
---
|
|
|
|
## Context
|
|
|
|
DEC-0056 and PLN-0187 delivered an audit of the existing VM resource contracts,
|
|
opt-in engineering diagnostics and reproducible macOS/arm64 workloads. The user
|
|
explicitly revised the closure criterion on 2026-10-14: accept the executed
|
|
functional, stationary and host evidence plus the observed extended run, waive
|
|
eight-hour completion for this delivery, and leave further testing to future
|
|
qualification. The discussion is closed; the interrupted timed run did not pass
|
|
an eight-hour endurance test. This lesson preserves the decision and its revision
|
|
after workflow cleanup; the [discussion index](../../index.ndjson) tracks closure.
|
|
|
|
Normative references remain [memory and GC](../../../docs/specs/runtime/03-memory-stack-heap-and-allocation.md),
|
|
[Registry/PBX](../../../docs/specs/runtime/02c-program-registry-and-pbx-v0.md),
|
|
[typed callables](../../../docs/specs/runtime/02b-vm-function-values-and-closures.md)
|
|
and [single-context lifecycle](../../../docs/specs/runtime/09a-coroutines-and-cooperative-scheduling.md).
|
|
The [published evidence report](../../../docs/vm-arch/resource-stability-qualification.md)
|
|
and its compact data record contain the enforcement matrix, commands, counters,
|
|
source-log hashes, environmental details and limitations. This lesson introduces
|
|
no new quotas, GC policy, instruction costs or runtime guarantees.
|
|
|
|
## Key Decisions
|
|
|
|
### Observe the existing collector before redesigning it
|
|
|
|
The implementation kept threshold-based collection at the published safepoints.
|
|
Fixed-size budget counters and logarithmic GC histograms expose behavior through
|
|
an opt-in Rust feature without expanding the guest ABI or retaining guest roots.
|
|
The audit did not reproduce a pre-existing VM contract violation requiring a
|
|
collector redesign. One newly added diagnostic needed before-step sampling to
|
|
count an entry whose first instruction immediately returns; its regression
|
|
distinguishes an observation defect from a change to execution semantics.
|
|
|
|
### Acceptance and run outcome are separate facts
|
|
|
|
Three stationary families each completed 216,000 frames and identical-input
|
|
replay with final session reservations zero. Functional suites, 1,000 headless
|
|
reset/reload cycles, desktop lifecycle tests and real-window controls also
|
|
passed. The longer release run reached a common checkpoint of 36,420,000 frames
|
|
per family/replay, with stable resource envelopes and no recorded replay failure.
|
|
External RSS ranged from 3,296 to 3,408 KiB over 369 samples.
|
|
|
|
That process exited with code 101 after approximately 3h22 elapsed when writing
|
|
stdout failed because the host disk was full. It never emitted completed active
|
|
duration, final replay/disposal or qualification-pass markers. The log occupied
|
|
about 5.7 MiB; its size alone did not explain exhaustion of the host volume.
|
|
The explicit scope revision accepted the available evidence, not an invented
|
|
successful run. Final disposal evidence comes from the normally completed
|
|
stationary and ownership/reset tests. Additional endurance, representative-game
|
|
headroom and unavailable-platform qualification remain unexecuted.
|
|
|
|
## Patterns and Algorithms
|
|
|
|
Compare memory at equivalent workload phases. A closure reachable during sync
|
|
collection can become unreachable at RET without enough subsequent allocation
|
|
to trigger another sweep. The observed stable 332-byte closure is expected
|
|
under the current policy; forcing collection to make every checkpoint zero
|
|
would test a different policy. Final owner disposal supplies a separate oracle.
|
|
|
|
Distinguish live guest objects, reserved capacities, retired/free handle slots,
|
|
native string owners and process RSS. Capacity can remain charged after objects
|
|
die, and a native string snapshot can legitimately retain its accounting domain
|
|
after VM disposal. A cloned budget observer retains accounting but no guest
|
|
owners, allowing the tests to assert zero only after the actual final owner dies.
|
|
|
|
Use independent sessions with identical input for lockstep replay. Compare logical
|
|
output, cycles and resource envelopes, while recording host timing separately.
|
|
Every frame has a finite slice guard; no-sync loops have a finite slice count
|
|
instead of an unreachable completed-frame target. Time-bounded runs must record
|
|
their actual logical progress rather than assuming identical frame counts across
|
|
equal wall durations or platforms.
|
|
|
|
## Pitfalls
|
|
|
|
- A no-op VM smoke cannot establish GC reachability. The replacement layer test
|
|
allocates 1,031 closures and checks that only the active environment survives.
|
|
- A fixed short sleep is not evidence of desktop responsiveness. Bounded polling
|
|
of logical progress removed the initial harness timing assumption.
|
|
- Reserved-capacity refusal counters can include speculative growth followed by
|
|
successful exact-capacity fallback; they are not guest trap counts.
|
|
- Histogram quantiles are bucket upper bounds, capped by the observed maximum.
|
|
Host timing includes scheduling effects and does not establish real-time safety.
|
|
- A stationary synthetic workload repeatedly exercises a bounded state space.
|
|
More elapsed time does not automatically supply more scenario coverage.
|
|
- An interrupted process supplies useful checkpoints but cannot prove execution
|
|
of its final assertions. An explicit acceptance revision must preserve that gap.
|
|
|
|
## Takeaways
|
|
|
|
Resource safety combines admission enforcement, ownership tests and integrated
|
|
observations; elapsed time alone cannot replace any of them. Preserve failures
|
|
and attribution, make acceptance changes explicit, and keep future qualification
|
|
separate from delivered evidence. The long-run example is manually invoked;
|
|
the repository pipelines run bounded automated tests and do not request the
|
|
eight-hour workload. Audio remains open and no audio behavior was qualified here.
|