Persist explicit human discussion choices, DEC requests and approval policies. Add optional evidence-backed Plan experiments and align context, adapters and next actions under protocol contract 3. Include WRK-000B decisions, plan history and verification evidence: 167 JVM tests, 25 focused checks, Jenkins fixtures and native smoke coverage.
51 lines
3.3 KiB
Markdown
51 lines
3.3 KiB
Markdown
# Deterministic Plan consolidation
|
|
|
|
WRK-0002/DEC-0001 defines Step → Plan → Work consolidation. A completed last
|
|
required step completes its Plan; each completed Plan rechecks all Plans owned by
|
|
the Work. Completion checks never invoke an agent. Acceptance criteria remain in
|
|
the Plans/steps, with their existing results, evidence and decision approvals.
|
|
|
|
The required set must contain a real completed delivery. Empty Works/Plans remain
|
|
open. OPEN/ACTIVE steps or Plans, unresolved questions/surveys, empty surveys and
|
|
draft decisions remain pending. In guided Works, missing conduct, absent applicable
|
|
DEC approval, open experiments and unresolved DEC concerns also remain pending. Explicit BLOCKED/CANCELLED states require explicit
|
|
resumption. Cancelling an item does not deliver it: `plan exclude WRK PLN [--step
|
|
TSK] --by NAME --reason TEXT` records a scope review of a cancelled item, retains
|
|
it and its history, and excludes only the reviewed content from the required set.
|
|
Changing that content invalidates its exclusion. Dependencies still require actual
|
|
completion; an exclusion does not satisfy a dependency.
|
|
|
|
`work reconcile WRK [--requester NAME] [--request-id KEY]` recovers missed
|
|
coordination. Mutation commands call the same coordination API. `work check`,
|
|
status, next-actions and context are read-only. Context/JSON and mutation reports
|
|
expose consolidation state and pending Plans, plus the existing EPIC report.
|
|
|
|
Planning owns optional versioned `exclusions[]` on a Plan, with target, content
|
|
hash, actor, reason and timestamp. Verification owns coordination and receipts;
|
|
Planning never imports Verification. A new SYSTEM_PLANS Work completion has
|
|
humanApproved=false, by=system:plans and optional `aggregation` provenance naming
|
|
an owned ART receipt, input digest, requester and request ID. The receipt identifies
|
|
the exact Plan revisions/hashes, including reviewed cancellations. Work prose
|
|
criteria may be automatically linked to this aggregate receipt for compatibility;
|
|
this records execution aggregation, not semantic proof of prose or a new human
|
|
approval. No manual Work-level criterion mapping is required.
|
|
|
|
Receipts use origin `ai-engineering:plans:<receipt-sha256>`. Their input hash omits
|
|
framework receipts so a published receipt can be reused after interruption. Final
|
|
completion freezes the full scope including the receipt. Recovery validates
|
|
integrity/history, consolidates Plans, publishes/reuses a receipt, records completion
|
|
and invokes existing EPIC reconciliation. Publication is atomic per file; malformed
|
|
or orphan records require explicit repair rather than silent deletion.
|
|
|
|
Existing completed Works and legacy serialized hashes remain unchanged. New
|
|
optional fields are omitted when absent. Manual completion remains available for
|
|
inspection-only Works without Plans. Adding a Plan to a completed Work requires
|
|
explicit reopening; unchanged old Plans do not immediately reclose a reopened Work.
|
|
Existing EPIC policy/authorization continues to govern EPIC completion.
|
|
|
|
Acceptance tests use disposable fixtures and a configured adapter that fails if
|
|
called. Required cases cover multiple Plans, last-step completion, explicit Plan
|
|
completion, cancellations/scope revisions, unresolved discussion/surveys/DECs,
|
|
empty sets, reopening, interrupted publication/replay, legacy data, corruption,
|
|
EPIC propagation and independent-process/native continuity.
|