Commit Graph
12 Commits
Author SHA1 Message Date
bquarkz 1471b427f1 feat(studio): deliver asset authoring and automation workflows
Intrepid/Prometeu/Studio/pipeline/pr-master There was a failure building this commit
Test / Tests and coverage occurred while executing withChecks step.
Add shared human/task asset batches with reviewed atomic publication, explicit
reference rebinds, ownership inspection and qualified glyph/scene budgets.
Expose the same authoring and capacity results through Assets and MCP.

Deliver isolated guest test targets, retained visual evidence and immutable
runtime lifecycle/control observations. Preserve provider qualification and
installed authoring examples alongside the completed discussion lessons.

Close AGD-106 coordination and the delivered discussion workflows through
housekeeping, updating lesson references and preserving qualification limits.
Sound remains outside the asset delivery wave.

Validation: 579 module tests and 31 additional desktop, process and installed
checks passed; native glyph/scene 16/17 boundaries qualified. Discussion
validation passed after housekeeping.
2026-11-11 01:21:25 +00:00
bquarkz bf31184d4d feat(pbs): add sprite animation and shared Studio authoring
Implement DEC-0084 with factory-only Sprite/Animator structs, complete result
lowering, validated animation sidecars, generated PBS factories and JavaFX/MCP
authoring through shared services.

Qualify native dev/release with ordinary and optimized producers, zero-allocation
playback, private-cycle reclamation, canonical Composer pixels, installed JARs
and JavaFX lifecycle. Preserve the runtime checkout and existing host ABI.
2026-11-05 15:16:07 +00:00
bquarkz 7558128215 packer (WIP) 2026-03-24 13:42:55 +00:00
bquarkz fac421e2ca packer (WIP) 2026-03-24 13:42:55 +00:00
bquarkz 83546149e4 packer (WIP) 2026-03-24 13:42:54 +00:00
bquarkz 9c657b0450 asset details (WIP) 2026-03-24 13:42:54 +00:00
bquarkz c0051e62cb asset details (WIP) 2026-03-24 13:42:52 +00:00
bquarkz 49d83e3ff8 implements PR-10a bank composition details dto projection 2026-03-24 13:42:50 +00:00
bquarkz 4050fcbcaa asset metadata form added 2026-03-24 13:42:48 +00:00
bquarkz b88a4e3c62 added contract update into asset workspace 2026-03-24 13:42:47 +00:00
bquarkz 4278d045c2 implements PR-020 2026-03-24 13:42:45 +00:00
bquarkz bb2c33a952 asset workspace progress 2026-03-24 13:42:45 +00:00