feat(studio): deliver asset authoring and automation workflows
Test / Tests and coverage occurred while executing withChecks step.
Intrepid/Prometeu/Studio/pipeline/pr-master There was a failure building this commit

Add shared human/task asset batches with reviewed atomic publication, explicit
reference rebinds, ownership inspection and qualified glyph/scene budgets.
Expose the same authoring and capacity results through Assets and MCP.

Deliver isolated guest test targets, retained visual evidence and immutable
runtime lifecycle/control observations. Preserve provider qualification and
installed authoring examples alongside the completed discussion lessons.

Close AGD-106 coordination and the delivered discussion workflows through
housekeeping, updating lesson references and preserving qualification limits.
Sound remains outside the asset delivery wave.

Validation: 579 module tests and 31 additional desktop, process and installed
checks passed; native glyph/scene 16/17 boundaries qualified. Discussion
validation passed after housekeeping.
This commit is contained in:
2026-11-11 01:21:25 +00:00
parent b351f2e582
commit 1471b427f1
325 changed files with 61179 additions and 323 deletions
@@ -99,4 +99,4 @@ The [desktop image](evidence/diagnostic-desktop.png) was captured from the actua
Long-lived operational rules are consolidated in [Studio 9](../../../docs/specs/studio/9.%20Studio%20Core%20and%20Adapter%20Architecture%20Specification.md), [Studio 10](../../../docs/specs/studio/10.%20DEV%20and%20Automation%20Specification.md), [Studio 11](../../../docs/specs/studio/11.%20MCP%20Tools%20and%20Project%20Knowledge%20Contract.md), [Compiler 19](../../../docs/specs/compiler/19.%20Verification%20and%20Safety%20Checks%20Specification.md), [Compiler 22](../../../docs/specs/compiler/22.%20Backend%20Spec-to-Test%20Conformance%20Matrix.md) and [PBS 12](../../../docs/specs/compiler-languages/pbs/12.%20Diagnostics%20Specification.md). The schema/examples remain in [studio-tools-v1.json](../../../prometeu-app/src/main/resources/mcp/studio-tools-v1.json).
DEC-0090 and PLN-0168 are completed control artifacts, consolidated here and housekept via the discussion CLI. [AGD-0106](../../workflow/agendas/AGD-0106-compiler-production-reliability-and-source-diagnostics.md) receives this integrated evidence alongside LSN-0104. The user accepted the submitted integrated evidence on 2026-11-10 and released the PLN-0166 gate. Its complete eight-case correction and final 168/108 matrix are consolidated in [LSN-0106](../DSC-0111-pbs-production-reproductions-and-fixes/LSN-0106-pbs-production-binding-and-lowering-corrections.md). This later result preserves the historical first-delivery reports here unchanged. The historical Zelda BAD_RET/Scene reports remain not reproduced.
DEC-0090 and PLN-0168 are completed control artifacts, consolidated here and housekept via the discussion CLI. [AGD-0106](../DSC-0104-compiler-game-production-reliability/LSN-0113-coordinating-compiler-reliability-and-diagnostic-delivery.md) preserves this integrated evidence alongside LSN-0104. The user accepted the submitted integrated evidence on 2026-11-10 and released the PLN-0166 gate. Its complete eight-case correction and final 168/108 matrix are consolidated in [LSN-0106](../DSC-0111-pbs-production-reproductions-and-fixes/LSN-0106-pbs-production-binding-and-lowering-corrections.md). This later result preserves the historical first-delivery reports here unchanged. The historical Zelda BAD_RET/Scene reports remain not reproduced.