feat(studio): deliver asset authoring and automation workflows
Test / Tests and coverage occurred while executing withChecks step.
Intrepid/Prometeu/Studio/pipeline/pr-master There was a failure building this commit

Add shared human/task asset batches with reviewed atomic publication, explicit
reference rebinds, ownership inspection and qualified glyph/scene budgets.
Expose the same authoring and capacity results through Assets and MCP.

Deliver isolated guest test targets, retained visual evidence and immutable
runtime lifecycle/control observations. Preserve provider qualification and
installed authoring examples alongside the completed discussion lessons.

Close AGD-106 coordination and the delivered discussion workflows through
housekeeping, updating lesson references and preserving qualification limits.
Sound remains outside the asset delivery wave.

Validation: 579 module tests and 31 additional desktop, process and installed
checks passed; native glyph/scene 16/17 boundaries qualified. Discussion
validation passed after housekeeping.
This commit is contained in:
2026-11-11 01:21:25 +00:00
parent b351f2e582
commit 1471b427f1
325 changed files with 61179 additions and 323 deletions
@@ -212,7 +212,7 @@ It must preserve the common compiler data and use stable FailureKind IDs, retain
the distinction between program diagnostics and failed operations. Shipper stays
internal; no direct public Shipper endpoint/workspace is required.
The local compiler result completes DSC-0112; integrated acceptance also required the Studio evidence. After the user accepted both deliveries on 2026-11-10, DEC-0088/PLN-0166 corrected all eight PBS failures. The completed result and immutable before/after evidence are consolidated in [LSN-0106](../DSC-0111-pbs-production-reproductions-and-fixes/LSN-0106-pbs-production-binding-and-lowering-corrections.md). The [umbrella](../../workflow/agendas/AGD-0106-compiler-production-reliability-and-source-diagnostics.md) coordinates closure of the combined result. This subsequent work does not alter the historical diagnostic evidence recorded here.
The local compiler result completes DSC-0112; integrated acceptance also required the Studio evidence. After the user accepted both deliveries on 2026-11-10, DEC-0088/PLN-0166 corrected all eight PBS failures. The completed result and immutable before/after evidence are consolidated in [LSN-0106](../DSC-0111-pbs-production-reproductions-and-fixes/LSN-0106-pbs-production-binding-and-lowering-corrections.md). The [umbrella](../DSC-0104-compiler-game-production-reliability/LSN-0113-coordinating-compiler-reliability-and-diagnostic-delivery.md) records closure of the combined result. This subsequent work does not alter the historical diagnostic evidence recorded here.
## Code References