Commit Graph
6 Commits
Author SHA1 Message Date
bquarkz a32f834b2b feat(graphics): migrate native target to 640x360
Intrepid/Prometeu/Runtime/pipeline/head This commit looks good
Centralize the fixed 640x360 RGBA8888/60 Hz contract in the existing HAL.
Preserve 8/16/32 tiles and composition, cover partial edges and mixed-size
camera movement, and adapt firmware, fixtures, hosts and native tests.

Share nearest-neighbor presentation geometry with pointer input. Measure
actual framebuffer publications and successful host presentations separately
from VM ticks, with bounded opt-in diagnostics and release harnesses.

Validated with the complete tooling verify gate, native rendering tests,
GPU readback, headless/process integration, formatting and strict clippy.
The existing synchronous session path is documented; no worker/session
architecture replacement or format compatibility layer is introduced.

Work: WRK-0016 / DEC-0001 / PLN-0001
Commit and push explicitly authorized by the user after completion.
2026-11-20 10:34:45 +00:00
bquarkz a2275932a5 Keep PBX at v0 and simplify Jenkins quality gate
Intrepid/Prometeu/Runtime/pipeline/pr-master There was a failure building this commit
2026-10-14 14:35:44 +01:00
bquarkz 0af8b2b1fe feat(runtime): add optional pause and resume lifecycle hooks
Intrepid/Prometeu/Runtime/pipeline/pr-master Build started...
2026-10-13 12:18:18 +01:00
bquarkz ec84a6bba5 feat(vm)!: implement typed callables and single-context execution
Intrepid/Prometeu/Runtime/pipeline/pr-master This commit looks good
Add structural Fn signatures, typed capture environments, indirect calls and Trait dispatch while preserving logical parameter and result groups, ownership and budgets.

Remove guest coroutine execution and legacy loading. Activate bounded sealed PBX v1 with mandatory capture metadata, preserve frame continuations and root return results, and migrate producers and shipped cartridges.

Publish coordinated specs, handoffs and the completed runtime lesson. Validation: 880 workspace tests passed, 9 existing tests ignored; both cartridges completed six production-host frames.
2026-10-09 05:47:24 +01:00
bquarkz f50a3f127f regenerate PBX test cartridges
Intrepid/Prometeu/Runtime/pipeline/head This commit looks good
2026-07-15 08:04:29 +01:00
bquarkz d6afa6ae6b implements PLN-0160 2026-07-05 01:18:33 +01:00