Add portable topics and surveys, decision approval history, execution plans, local Codex and Claude adapters, and general agent routing. Consolidate Plan and EPIC results through deterministic completion receipts, reviewed cancellation scope and recoverable reconciliation. Track the completed WRK-0001 and WRK-0002 records, protocol documentation, source manifests and delivery evidence. Validation: 117 tests including Modulith; GraalVM 25 native compilation, standalone smoke and ZIP/TAR verification on macOS ARM64; identical persisted context across JVM and native executions.
110 lines
6.7 KiB
Plaintext
110 lines
6.7 KiB
Plaintext
# WRK-0002 / PLN-0001 — observed delivery evidence
|
|
|
|
Date: 2026-11-14. Platform actually built and tested: macOS ARM64.
|
|
Authority: DEC-0001 ACCEPTED, human recommendations accepted in DSC-0009 and
|
|
implementation explicitly requested in DSC-0011. No new human delivery approval
|
|
is invented: Work completion follows the accepted deterministic aggregation rule.
|
|
|
|
## Scope and source identity
|
|
|
|
Implemented Step → Plan → Work aggregation, public mutation notifications and
|
|
explicit `work reconcile`, content-bound `plan exclude` scope review, deterministic
|
|
pending diagnostics and SYSTEM_PLANS receipts. Criteria stay in Plans/steps; Work
|
|
completion does not require another manual criterion checklist or model inquiry.
|
|
EPIC completion retains its existing explicit policy authority and SYSTEM_EPIC origin.
|
|
|
|
Verification/PlanCoordinator owns coordination/receipts; Planning owns Plans/steps
|
|
and exclusion history; Work owns lifecycle/provenance; Artifact owns evidence;
|
|
CLI exposes state/commands. Ten Modulith modules remain. No dependency/framework,
|
|
server, database, command executor or preview language feature was added.
|
|
|
|
Git HEAD c84bb8d36f88ef249a249cdfe7b476fd148717af is the baseline, not a claim that
|
|
the implementation was committed there. The workspace contains uncommitted changes.
|
|
ART-0011 captures 99 source/test/resource/build/documentation files, including
|
|
previously untracked files, excluding mutable .ai-engineering bookkeeping.
|
|
Manifest SHA-256: 87421f60ffc5a2b1738e898deea572b6a6c29969a0947a6fefa8c232139bd3f6.
|
|
|
|
## Commands and actual outcomes
|
|
|
|
```
|
|
./gradlew test --tests '*PlanConsolidationTest' --console=plain
|
|
./gradlew test --console=plain
|
|
./gradlew -Dorg.gradle.java.home=/path/to/graalvm25 test --tests '*PlanConsolidation*' --tests '*OperationalWorkflowTest' --console=plain
|
|
./gradlew -Dorg.gradle.java.home=/path/to/graalvm25 clean test bootJar nativeCompile --console=plain
|
|
JAVA_HOME=/path/to/graalvm25 GRAALVM_HOME=/path/to/graalvm25 ./gradlew nativeCompile --console=plain
|
|
JAVA_HOME=/path/to/graalvm25 GRAALVM_HOME=/path/to/graalvm25 ./gradlew nativeDistZip nativeDistTar -PtargetPlatform=macos-arm64 --console=plain
|
|
```
|
|
|
|
Actual GraalVM home: /Users/niltonconstantino/.sdkman/candidates/java/25.5.5.0+3-graalce.
|
|
GraalVM CE 25.5.5.0.3 / JDK 25.0.5.0.3; Gradle Wrapper 9.3.1; Java release 25.
|
|
|
|
Four initial acceptance tests compiled and failed for absent behavior (ART-0002).
|
|
The first broader run exposed two old manual-closure fixture expectations; these
|
|
were updated for the new behavior. Two added fixture assertions were corrected
|
|
for required DEC content and provenance access. Targeted 16 scenarios then passed.
|
|
The final clean run's test/bootJar tasks passed 117 tests in 19 suites: zero failures,
|
|
errors or skipped tests, including Modulith (ART-0004/0005).
|
|
|
|
That clean command's native task failed because Native Build Tools used SDKMAN
|
|
current, which pointed to Amazon JDK without native-image. Explicit JAVA_HOME and
|
|
GRAALVM_HOME corrected selection; nativeCompile passed in 1m28s (ART-0006).
|
|
Seven upstream warnings and build-time SLF4J notices remain. Both packaging tasks
|
|
passed with nativeCompile up-to-date (ART-0009). No unresolved test/build failure
|
|
or successful CI execution on another platform is claimed.
|
|
|
|
The development sandbox initially blocked the Gradle cache lock; authorized tests
|
|
ran outside it. The orchestration tool connection was replaced during evidence
|
|
registration; persisted artifact state was inspected before continuing, avoiding
|
|
duplicate attachment. No provider/model request was made in this Work.
|
|
|
|
## Verified behavior and continuity
|
|
|
|
- Last completed step consolidates its Plan; another required Plan keeps Work open.
|
|
- Completed required Plans close Work with SYSTEM_PLANS and humanApproved=false.
|
|
- Cancelled scope requires explicit review; history/content binding is retained.
|
|
- Exclusion does not satisfy a step dependency; changing reviewed content invalidates it.
|
|
- Empty sets, explicit blocked/cancelled states, unanswered discussion/surveys and
|
|
draft DECs remain pending. Resolving the final impediment re-evaluates completion.
|
|
- Explicit Work/Plan reopening leaves time to revise/add Plans; old conclusions remain.
|
|
- A new coordinator recovers persisted last-step and receipt publication; replay
|
|
does not duplicate completion or receipt. Invalid evidence prevents step mutation.
|
|
- Child Plan completion propagates to an authorized EPIC without another human closure.
|
|
- A configured must-not-run adapter cannot be invoked; no model is required for checks.
|
|
|
|
The isolated executable alone passed the complete native smoke with nonexistent
|
|
JAVA_HOME/GRAALVM_HOME and no JVM on PATH, with no helper dylibs copied (ART-0007).
|
|
This includes legacy single/multi-Git, refinement, controlled CLI transports, EPIC,
|
|
operational-cycle and new two-Plan/cancelled-scope/replay scenarios.
|
|
|
|
Retained synthetic fixture:
|
|
/var/folders/0t/tfsqc14j5wbgh9h4s4dytwb00000gq/T/ai-engineering-smoke.YUYSGM
|
|
Its plan-consolidation context reloaded in fresh JVM/native processes byte-for-byte
|
|
identically; SHA-256 01d7a53cbff10ab9ca39b8915bc99f96ba5d1a7985985abcccdd6c9c30180ae6.
|
|
Fixture validation and the pre-existing completed WRK-0001 were valid (ART-0008).
|
|
|
|
ZIP/TAR were extracted and retained executable permissions, the exact tested binary
|
|
and current docs. ZIP validated the fixture without JVM; TAR ran --version without
|
|
JVM (ART-0010). Native SHA-256:
|
|
64aa4bc9f4c241457a7c604239f3bdfe8c96a56899a0dd600d3f6acca381b75e.
|
|
ZIP SHA-256: d18f5eb0b8ec931f7e0e6b394d822d017bc74a10c7c71c26cd432fa4559ad25b.
|
|
TAR SHA-256: d2292a13455c75f398dae25fe5715c9293fe6f8332aba7b45aa8227d674d49b7.
|
|
|
|
Canonical README, architecture, protocol, roadmap, experiments, consolidation contract
|
|
and bundled entry guide/manifest are updated. Source-project onboarding refreshed
|
|
only its guide/manifest; root AGENTS.md bytes remain unchanged. Zelda was not modified.
|
|
|
|
## Limits and final transition
|
|
|
|
Coordination is invoked through public CLI/PlanCoordinator APIs; low-level storage
|
|
callers explicitly reconcile. Publication remains atomic per file, with deliberate
|
|
inspection/repair for malformed or orphan records. Aggregation validates recorded
|
|
execution state/integrity; it does not infer semantic correctness of arbitrary prose
|
|
or prove the external execution behind a supplied log. Repository execution and
|
|
legacy import remain separate work. Only macOS ARM64 native distribution was tested.
|
|
|
|
This report is attached before the final step transition. Marking TSK-0005 COMPLETED
|
|
with these actual results will exercise this project's own consolidation; the final
|
|
Plan/Work state and system receipt are recorded by the framework, not asserted here
|
|
in advance. Next experiment: a bounded external multi-Plan pilot with pending-state
|
|
report review before broadening execution capabilities.
|