feat: add Work guidance and adaptive Plan experiments
Test / Tests and coverage occurred while executing withChecks step.
Intrepid/AI Engineering/pipeline/head There was a failure building this commit
build / jvm (push) Canceled after 0s
build / native (macos-15, macos-arm64) (push) Canceled after 0s
build / native (ubuntu-24.04, linux-x86_64) (push) Canceled after 0s
build / native (windows-2025, windows-x86_64) (push) Canceled after 0s
Test / Tests and coverage occurred while executing withChecks step.
Intrepid/AI Engineering/pipeline/head There was a failure building this commit
build / jvm (push) Canceled after 0s
build / native (macos-15, macos-arm64) (push) Canceled after 0s
build / native (ubuntu-24.04, linux-x86_64) (push) Canceled after 0s
build / native (windows-2025, windows-x86_64) (push) Canceled after 0s
Persist explicit human discussion choices, DEC requests and approval policies. Add optional evidence-backed Plan experiments and align context, adapters and next actions under protocol contract 3. Include WRK-000B decisions, plan history and verification evidence: 167 JVM tests, 25 focused checks, Jenkins fixtures and native smoke coverage.
This commit is contained in:
+13
-2
@@ -391,8 +391,10 @@ timestamps and revision metadata. Each step (`TSK-0001`, decimal and plan-local)
|
||||
records title/description, acceptance criteria, dependencies, status, result, evidence
|
||||
and modification time. Statuses match Work's five values but describe external work.
|
||||
|
||||
`plan create --decision DEC` promotes referenced DRAFT decisions automatically,
|
||||
without an adapter or LLM. Input, decision and revision-history validation runs
|
||||
`plan create --decision DEC` promotes eligible DRAFT decisions without an adapter
|
||||
or LLM. Guided Works require an explicit Work-wide human waiver; otherwise the DEC
|
||||
needs human approval before Plan creation. Legacy Works retain prior promotion
|
||||
semantics until explicit guidance adoption. Input, decision and revision-history validation runs
|
||||
before promotion, under the project lock. Ordinary publication failures roll back
|
||||
the attempted Plan and promotions. Publication is atomic per file, not a crash-proof
|
||||
multi-file transaction: interrupted writes or failed recovery remain inspectable
|
||||
@@ -574,6 +576,15 @@ incomplete staging outputs, ignored by readers; inspect and clean them manually
|
||||
an interrupted write. Concurrent manual editors do not honor the CLI lock. Directory
|
||||
entry durability under sudden power loss depends on the host filesystem.
|
||||
|
||||
## Work guidance and OODA
|
||||
|
||||
Contract 3 adds optional typed Work guidance and Plan experiments. New Works ask
|
||||
for human discussion mode and require human DEC approval by default; explicit
|
||||
Work-wide waivers and requests retain human provenance. Guided operations enforce
|
||||
the selected authority. See [Work conduct and adaptive implementation](work-guidance.md)
|
||||
for commands, experiment criteria/results, affected execution and legacy behavior.
|
||||
This preserves the existing loops and does not add a repository executor.
|
||||
|
||||
## Future contracts (design only)
|
||||
|
||||
- Additional AgentAdapter transports and execution permissions: local proposal-only
|
||||
|
||||
Reference in New Issue
Block a user