# WRK-000B — Implementation and verification

DEC-0001 formalizes SVY-0001 and the four explicitly accepted suggestions. Human instruction DSC-0006 requested DEC, Plan and implementation. The decision retains direct human approval; no Work-wide waiver was inferred for this Work.

Implemented contract 3 without changing the Discussion → DEC → Plan flow or its two loops:
- Persisted human DIRECT/EXPLORATORY choice, default REQUIRED approval, explicit Work-wide waiver, request per DEC and choice history.
- Missing choice asks rather than guesses. Exploration challenges assumptions and synthesizes alternatives; the human requests its DEC. Direct conduct may draft and seek applicable approval.
- Deterministic guards for drafting, revising, Plan creation and affected execution; agent bundles preflight premature drafts before any publication. Context, prompts and next-actions carry the conduct.
- Optional Plan experiments with prior hypothesis, criterion and invocation, immutable observed outcome, owned evidence, interpretation and next action. Failed hypotheses require explicit reconsideration before repetition.
- Open experiments and questioned DECs block affected steps/dependents, allowing independent work and authorized investigation. Concerns need an accepted revision; dropping references cannot resolve them. Terminal Plans can be reopened to repair stale references, without authorizing execution against them.
- Contracts 1/2 and legacy hashes remain readable. No historical Work migration or inferred human instruction.

Verification performed now:
- ./gradlew check --console=plain: 167 tests, zero failures/errors/skips; 11 Jenkins fixture scenarios; module architecture verification included.
- Final GraalVM build: 25 focused tests passed, native executable and macOS ARM64 ZIP/TAR generated. Final focused set covers Work guidance, Plan experiments, operational lifecycle and decision promotion.
- Full native smoke passed with JAVA_HOME/GRAALVM_HOME=/nonexistent and no JVM/model on PATH; controlled local-CLI fixtures are labeled synthetic. Includes human request/default approval/waiver, evidence-driven revision, independent execution, EPICs, completion and reopening.
- First smoke was restricted by the macOS sandbox (sysctl failed); the same command passed outside the sandbox using only disposable fixtures.
- Project validation before/after onboarding: valid, no issues. Compatibility: LEGACY_COMPATIBLE, readable, no migration required, because historical representations remain intact.
- All 474 files belonging to previous Works match the pre-implementation SHA-256 baseline.
- Installed aie is byte-identical to the smoke-tested native executable. Onboarding updated only the four entry/instruction files with backups. The local project advertises contract 3.

Evidence: ART-0001 full regression XML/summary; ART-0002 source archive/SHA-256; ART-0003 final build log. Additional operational proof retains focused XML, smoke log, distribution hashes and compatibility/onboarding/installation reports.

Baseline Git revision: a7e3a2fdfc421a49dbbc2061e27e76c943daaa97. Changes remain in the working tree; no commit or push was requested or performed.

Limits: the framework validates recorded authority, references, evidence integrity and state. It neither executes repository commands nor semantically proves that a hypothesis, DEC or prose acceptance criterion is correct. Experiment records are optional and impose no mandatory OODA pipeline.